Linha de montagem para a produção de habitações em light steel frame : projeto e otimização
Arquivos
Data
2016-05-25
Autores
Título da Revista
ISSN da Revista
Título de Volume
Editor
Universidade Federal de São Carlos
Resumo
The Construction Industry (CI), regarding the production of single-family housing in Brazil, is
still characterized by the use of techniques and technologies that are highly dependent on
knowledge and manpower experience. Thus, in most projects involving the construction of
single-family housing, there are handcraft features when the building site is understood as a
production system. Thus, it is common to observe the pathological manifestations
appearance in post-occupational analysis, in addition to non-compliance with deadlines and
budgets. In this sense, this thesis suggests that the CI breaks with some technical and
cultural paradigms from the use of an industrialized building system, such as Light Steel
Frame (LSF) and from the use of assembly lines, focusing the industrialization of singlefamily
housing production. This proposal is based on four steps involving theoretical and
experimental approaches. The theoretical approaches involved the structuring of a
systematic literature review, which were identified gaps in scientific knowledge and the
research hypothesis, besides the development of basic theoretical framework, the product
definition and production system design. The experimental approach was represented by
activities related to computer simulation of the production system and its subsequent
optimization. The computer simulation was performed with the ProModel® software where
was simulated the production of five hundred housing units from the programming logic of
the designed system. Seven scenarios were simulated, with the results of its simulation it
was possible to identify the most efficient configuration from optimizing the use of some
resources, identified by layout B. In addition, the main results of the simulations show that it
is possible to assembly the housing unit designed at 11.14 hours, with a cycle time of 5.56
hours, with the settings of scenario seven. The purpose of this thesis and the results can be
considered relevant because promote innovation for both the consumer market and to the
academy, since it deals with concepts little used or known in the CI. It also enables greater
speed and volume of production, facing the Brazilian housing deficit, with significant quality
improvements.
Descrição
Citação
VIVAN, André Luiz. Linha de montagem para a produção de habitações em light steel frame : projeto e otimização. 2016. Tese (Doutorado em Engenharia Civil) – Universidade Federal de São Carlos, São Carlos, 2016. Disponível em: https://repositorio.ufscar.br/handle/20.500.14289/8164.